High-Bay Warehouse Automation, AS/RS Stacker Cranes & Bozer-White Chebyshev Travel
AS/RS Crane Bozer-White Single vs Dual Command Formula
Calculate AS/RS Rack Time-Shape Factor b, Expected Single-Command Cycle Time E[SC] (s), Interleaved Dual-Command Cycle Time E[DC] (s), and Dual-Command Throughput (pallets/h).
Stacker cranes move horizontally AND vertically at the same time—and interleaving putaway + retrieval boosts pallet throughput 26%
High-bay Automated Storage & Retrieval System (AS/RS) stacker cranes drive aisle travel v_x and mast hoist v_y simultaneously under the Chebyshev (L_infinity) metric t = MAX(x / v_x, y / v_y), not Manhattan sum x/v_x + y/v_y. Yavuz Bozer and John White (1984) normalized rack aisle travel t_x = L / v_x and mast lift t_y = H / v_y by Scaling Time T = MAX(t_x, t_y) and Dimensionless Rack Shape Factor b = MIN(t_x, t_y) / T (0 < b <= 1, with b = 1 representing a "Square-in-Time" rack). Under randomized uniform storage with shuttle Pickup/Deposit time t_PD (s), Expected Single-Command Time (1 putaway OR 1 retrieval) is E[SC] = T * (1 + b^2 / 3) + 2 * t_PD, whereas Dual-Command Interleaving (storing 1 inbound pallet AND retrieving 1 outbound pallet on the same aisle excursion) takes E[DC] = T * (4/3 + 0.5*b^2 - b^3 / 30) + 4 * t_PD—moving 2 pallets per E[DC] cycle.
Verify on a 90 m x 24 m High-Bay Unit-Load Stacker Crane—Rack_Length L = 90.0 m (B2), Rack_Height H = 24.0 m (B3), Horizontal_Speed v_x = 2.50 m/s (t_x = 36 s, B4), Vertical_Hoist_Speed v_y = 0.80 m/s (t_y = 30 s, B5 -> Shape Factor b = 30 / 36 = 0.833 in E2), and Telescoping_Fork_P/D t_PD = 12.0 s (B6): Single-Command E[SC] equals 68.33 s (52.68 plts/h, E3), Dual-Command E[DC] equals 107.81 s (E4), and Interleaved Throughput hits 66.79 pallets/hour (+26.8% more moves per crane!, E5).
| Bozer-White AS/RS Crane KPI (L=90 m @ 2.5 m/s, H=24 m @ 0.8 m/s, t_PD=12 s) | Formula | Verified Output |
|---|---|---|
| Rack Time-Shape Factor b (0..1) | MIN(L/vx, H/vy) / MAX(L/vx, H/vy) | 0.833 (0.556 @ faster 1.2 m/s hoist) |
| Single-Command Cycle E[SC] (sec) | T * (1 + (b^2)/3) + 2 * t_PD | 68.33 s (63.70 s @ 1.2 m/s hoist) |
| Dual-Command Cycle E[DC] (sec) | T * (4/3 + 0.5*b^2 - (b^3)/30) + 4*t_PD | 107.81 s (101.35 s @ 1.2 m/s hoist) |
| Dual-Command Pallets / Hour | 2 * (3600 / E_DC_sec) | 66.79 plts/h (71.04 plts/h @ 1.2 m/s) |
Bozer-White Chebyshev Single-Command & Dual-Command AS/RS Throughput Formula
Validate Rack_Length > 0 m, Rack_Height > 0 m, Horiz_Speed > 0 m/s, Vert_Speed > 0 m/s, and Shuttle_PD_sec >= 0.
=LET(ln_x, B2, ht_y, B3, vx_s, B4, vy_s, B5, pd_s, B6, IF(OR(ln_x <= 0, ht_y <= 0, vx_s <= 0, vy_s <= 0, pd_s < 0), "Invalid ASRS Input", LET(tx_s, ln_x / vx_s, ty_s, ht_y / vy_s, tm_x, MAX(tx_s, ty_s), bf_r, MIN(tx_s, ty_s) / tm_x, dc_s, tm_x * ((4 / 3) + 0.5 * (bf_r ^ 2) - ((bf_r ^ 3) / 30)) + 4 * pd_s, ROUND(2 * (3600 / dc_s), 2))))High-Speed 1.20 m/s Hoist Motor Upgrade Check (Set Vertical Speed vy = 1.20 m/s)
Upgrade the mast hoist drive from 0.80 to 1.20 m/s (B5 = 1.2): Vertical Full-Mast Time drops from 30 s to 20 s (b E2 drops to 0.556 because 36 s horizontal travel now dominates Chebyshev time), trimming E[SC] E3 to 63.70 s, E[DC] E4 to 101.35 s, and lifting Dual-Command Capacity E5 to 71.04 pallets/h.
=IF(ISTEXT(E5), E5, LET(tx_s, B2 / B4, ty_s, B3 / B5, tm_x, MAX(tx_s, ty_s), bf_r, MIN(tx_s, ty_s) / tm_x, ROUND(tm_x * ((4 / 3) + 0.5 * (bf_r ^ 2) - ((bf_r ^ 3) / 30)) + 4 * B6, 2)))Try the example
Use the original values or change them to test your understanding.