Arte SheetsLearn. Try. Understand.

Bulk Material Handling, CEMA Belt Conveyors, Mining & Aggregate Plant Engineering

Belt Conveyor Bulk Tonnage Capacity & Drive Power Formula

Calculate CEMA Mass Conveying Capacity Q_m (t/h), Potential Gravity Lift Power P_lift (kW), Horizontal Idler Rolling Friction Power P_fric (kW), and Required Drive Motor Shaft Power (kW).

Switching a belt conveyor from crushed limestone to dense iron-ore concentrate trips the gearbox breaker even at identical volumetric belt profile

On a 3-roll troughed belt conveyor carrying CEMA Surcharge Cross-Sectional Ribbon Area A_b (m², set by belt width, troughing idler angle, and material surcharge angle) at Belt Speed v (m/s), Volumetric Capacity Q_v = 3,600 * A_b * v (m³/h) stays fixed—whereas Mass Tonnage Rate Q_m = 3,600 * A_b * v * rho_b (metric tons/hr, with Bulk Density rho_b in t/m³) AND Drive Power scale directly with material mass. Neglecting empty-belt tare and skirtboard drag for preliminary sizing, Lifting Material Through Net Elevation H (m) requires Gravity Potential Power P_lift = (dot_m * g * H) / 1,000 kW (where dot_m = A_b * v * rho_b * 1,000 kg/s and g = 9.80665 m/s²), while Carrying Material Horizontally Over Projected Length L (m) against Artificial Idler Friction Factor f (~0.020–0.030) consumes P_fric = (f * (A_b * rho_b * 1,000) * L * g * v) / 1,000 kW, divided by Reducer/Drive Efficiency eta.

Verify on a 1,000 mm Quarry Inclined Belt Conveyor—Troughed_Ribbon_Area A_b = 0.115 m² (B2), Belt_Speed v = 2.40 m/s (B3), Crushed_Stone_Bulk_Density rho_b = 1.60 t/m³ (B4 -> Mass Capacity = 1,589.76 t/h in E2), Horizontal_Center_Length L = 180.0 m (B5), Net_Vertical_Lift H = 18.0 m (B6), Idler_Friction f = 0.025 (B7), and Gearbox_Efficiency eta = 0.88 (B8): Gravity Lift Power equals 77.95 kW (E3), Material Friction Power equals 19.49 kW (E4), and Required Motor Shaft Power hits 110.73 kW (E5).

CEMA Belt Conveyor KPI (Ab=0.115 m², v=2.4 m/s, rho=1.60 t/m³, L=180 m, H=18 m)FormulaVerified Output
Mass Tonnage Capacity Qm (t/h)3600 * Belt_Area_m2 * Speed_m_s * rho_t_m31,589.76 t/h (2,384.64 @ 2.40 t/m³ ore)
Gravity Elevation Power Plift (kW)(Ab * v * rho*1000 * 9.80665 * H) / 100077.95 kW (116.93 kW @ 2.40 t/m³ ore)
Material Rolling Friction Power (kW)(f * Ab * rho*1000 * L * 9.80665 * v)/100019.49 kW (29.23 kW @ 2.40 t/m³ ore)
Required Motor Shaft Power (kW)(Plift_kW + Pfric_kW) / Drive_Efficiency110.73 kW (166.09 kW trips 132 kW drive)

CEMA Troughed Belt Tonnage, Elevation Lift & Idler Friction Power Formula

Validate Belt_Area > 0, Belt_Speed in (0, 10] m/s, Bulk_Density > 0 t/m³, Length > 0 m, Lift >= 0 m (non-regenerative uphill/horizontal conveyor), Friction f in [0.010, 0.100], and Efficiency in (0, 1].

=LET(ab_m, B2, vb_s, B3, rb_t, B4, lh_m, B5, hv_m, B6, fr_i, B7, ef_d, B8, IF(OR(ab_m <= 0, vb_s <= 0, vb_s > 10, rb_t <= 0, lh_m <= 0, hv_m < 0, fr_i < 0.01, fr_i > 0.1, ef_d <= 0, ef_d > 1), "Invalid Conveyor Input", LET(ms_k, ab_m * vb_s * rb_t * 1000, pw_l, (ms_k * 9.80665 * hv_m) / 1000, pw_f, (fr_i * (ab_m * rb_t * 1000) * lh_m * 9.80665 * vb_s) / 1000, ROUND((pw_l + pw_f) / ef_d, 2))))

Dense Iron-Ore Concentrate Campaign Overload Check (Set Bulk Density rho_b = 2.40 t/m³)

Feed dense iron-ore concentrate (rho_b B4 = 2.40 t/m³) at the same 0.115 m² belt profile: Tonnage E2 surges 50% to 2,384.64 t/h, Lift Power E3 climbs to 116.93 kW, Friction Power E4 reaches 29.23 kW, and Required Shaft Power E5 jumps to 166.09 kW—explaining why a 132 kW limestone motor trips on thermal overload unless feeder gate area A_b is choked back.

=IF(ISTEXT(E5), E5, ROUND(3600 * B2 * B3 * B4, 2))

Try the example

Use the original values or change them to test your understanding.

Further reading