Arte SheetsLearn. Try. Understand.

Metalcasting & Steel Foundry Engineering, Caine (1948) AFS Hyperbolic Riser Feeding Law

Caine Sand-Casting Riser Freezing-Ratio & Yield Formula

Calculate Actual Riser-to-Casting Modulus Freezing Ratio x = Mr/Mc, Volume Ratio y = Vr/Vc, Caine Hyperbolic Minimum Soundness Ratio xmin, and Mold Casting Yield (%).

Passing Chvorinov’s modulus rule (Mr > Mc) is NOT enough—if riser liquid volume cannot feed 3.5% steel solidification shrinkage, Caine’s hyperbola exposes a pipe cavity

Foundry engineers often size a cylindrical sand-casting feeder riser (Diameter D_r cm, Height H_r cm -> Volume V_r = (PI()/4) * D_r^2 * H_r, Non-Feeding Cooling Area A_r = PI() * D_r * H_r + (PI()/4) * D_r^2, Modulus M_r = V_r / A_r) solely for M_r >= 1.2 * M_c (Casting Modulus M_c = V_c / A_c)—forgetting Volumetric Solidification Contraction b (~0.035 = 3.5% for carbon steel, ~0.06 for aluminum). J. B. Caine (1948, AFS Transactions) unified thermal freezing rate AND liquid mass feeding into his celebrated Hyperbolic Soundness Boundary between Actual Freezing Ratio x = M_r / M_c and Riser-to-Casting Volume Ratio y = V_r / V_c: xmin = (a / (y - b)) + c (where a = 0.10, c = 1.00 for un-sleeved steel sand molds; x >= xmin guarantees X-ray soundness, whereas x < xmin draws primary shrinkage pipe straight down into the casting), traded directly against **Pouring Metal Yield Yield% = (V_c / (V_c + V_r)) * 100%**.

Verify on a 4,200 cm³ (32.9 kg) WCB Cast-Steel Valve Body—Casting_Volume V_c = 4,200 cm³ (B2), Casting_Surface_Area A_c = 1,680 cm² (M_c = 2.50 cm, B3), Cylindrical_Riser_Diameter D_r = 14.0 cm (B4), Riser_Height H_r = 18.0 cm (B5 -> V_r = 2,770.9 cm³, M_r = 2.930 cm), Steel_Shrinkage_Fraction b = 0.035 (B6), and Caine_Constant a = 0.10 (B7): Actual Freezing Ratio x equals 1.172 (E2) at Volume Ratio y = 0.660 (E3), clearing Caine Minimum xmin = 1.160 (1.172 >= 1.160 X-ray sound. E4) at 60.3% Casting Yield (E5).

AFS Caine Riser Soundness KPI (Steel Vc=4,200 cm³, Ac=1,680 cm² -> Mc=2.50 cm, b=0.035)FormulaVerified Output
Actual Freezing Ratio x (Mr / Mc)(Vr / (PI()*Dr*Hr + PI()/4*Dr^2)) / (Vc / Ac)1.172 (0.793 freezes EARLY @ Dr=9.5 cm)
Riser Volume Ratio y (Vr / Vc)((PI()/4) * Dr^2 * Hr) / Casting_Vc_cm30.660 (0.203 starved feed metal)
Caine Min Soundness Ratio xmin(Caine_a / (Volume_Ratio_y - Shrink_b)) + 1.01.160 PASS (x=1.172>=1.160 vs 1.597 FAIL)
Net Mold Casting Yield (%)(Vc / (Vc + Vr)) * 10060.3% sound (83.2% SCRAPPED BY PIPE)

J. B. Caine (1948) AFS Hyperbolic Freezing-vs-Volume Soundness Formula

Validate Casting_Volume V_c > 10 cm³, Casting_Area A_c > 10 cm², Riser_Diameter D_r > 1 cm, Riser_Height H_r > 1 cm, Shrinkage b in [0.005, 0.10], positive volume excess y > b + 0.02, and Caine a in [0.01, 0.50].

=LET(vc_c, B2, ac_c, B3, dr_c, B4, hr_c, B5, sb_f, B6, ca_k, B7, vr_c, (PI() / 4) * (dr_c ^ 2) * hr_c, yv_r, vr_c / vc_c, IF(OR(vc_c <= 10, ac_c <= 10, dr_c <= 1, hr_c <= 1, sb_f < 0.005, sb_f > 0.1, yv_r <= sb_f + 0.02, ca_k < 0.01, ca_k > 0.5), "Invalid Caine Riser Input", ROUND((vc_c / (vc_c + vr_c)) * 100, 1)))

Undersized Greedy-Yield Riser (D_r = 9.5 cm, H_r = 12 cm) Centerline Shrinkage Cavity Check

Shrink the open sand riser to B4 = 9.5 cm x B5 = 12.0 cm chasing 83.2% foundry yield (E5): Volume Ratio y E3 drops to 0.203, pushing Caine Required xmin E4 UP to 1.597 while Actual x E2 falls to 0.793 (0.793 << 1.597)—guaranteeing a deep shrinkage cavity under radiographic inspection (unless insulated with an exothermic sleeve where c ~= 0.70).

=IF(ISTEXT(E5), E5, LET(vr_c, (PI() / 4) * (B4 ^ 2) * B5, yv_r, vr_c / B2, ROUND((B7 / (yv_r - B6)) + 1, 3)))

Try the example

Use the original values or change them to test your understanding.

Further reading