Overhead Utility Distribution Protection, IEEE C37.60 Auto-Recloser & Expulsion Fuse TCC

Distribution Recloser Fuse-Saving Coordination Formula

Calculate Fast-Trip Fault Joule Let-Through I²t (kA²·s), Fast-Clear-to-Fuse-MMT Ratio (<= 0.75), Slow-Curve-to-Fuse-TCT Backup Ratio (>= 1.35), and Fuse-Saving Margin (ms).

Close-in 4,600 A feeder faults outrun a 2.5-cycle vacuum recloser—melting 65T lateral fuses in 31 ms BEFORE the fast curve clears and turning temporary squirrel faults into truck rolls

Because 80% of overhead 13.8 kV / 34.5 kV distribution faults are temporary lightning flashovers or tree-branch slaps, IEEE C37.60 Pole-Top Vacuum Auto-Reclosers run a 2-Fast + 2-Delayed sequence (101-A-fast -> 0.5 s dead-time reclose -> 117-C-slow) to save downstream lateral cutout fuses (Fuse-Saving) on transient faults while letting the fuse blow selectively on permanent faults. Selective coordination at Lateral Fault Current I_f (A) demands two Time-Current Characteristic (TCC) margins: 1) Fast-Trip Fuse-Saving tfast / tMMT <= 0.75 (giving positive Fuse Thermal Damage Margin Delta_tsave = (0.75 * tMMT - tfast) * 1,000 ms below Fuse Minimum Melting Time tMMT so I^2 * t heating never fatigues the silver/tin link), and 2) Delayed Slow-Curve Selectivity tslow / tTCT >= 1.35 above Fuse Total Clearing Time tTCT so permanent lateral faults blow ONLY the lateral tap without locking out the entire backbone feeder.

Verify on a Mid-Feeder 100T Lateral Tap (I_f = 1,850 A)—Lateral_Fault I_f = 1,850 A (B2), Recloser_Fast_Total_Clear tfast = 0.048 s (2.9 cycles, B3), Fuse_Min_Melt tMMT = 0.086 s (B4), Fuse_Total_Clear tTCT = 0.135 s (B5), and Recloser_Slow_Curve tslow = 0.310 s (B6): Fast-Trip Joule Let-Through I^2 * t equals 0.164 kA²·s (E2), Fast-to-MMT Ratio equals 0.558 (<= 0.75 fuse saved. E3), Slow-to-TCT Ratio equals 2.30 (>= 1.35 selective. E4), with +16.50 ms of clean fuse-saving cushion (E5).

IEEE C37.60 Recloser-Fuse TCC KPI (75% MMT Damage Limit, 1.35x TCT Slow Margin)FormulaVerified Output
Fast-Trip Joule Impulse (kA²·s)((Fault_Current_A / 1000) ^ 2) * Fast_Clear_s0.164 kA²·s (0.889 kA²·s close-in)
Fast-to-MMT Fuse-Save RatioRecloser_Fast_s / Fuse_Min_Melt_MMT_s0.558 SAVED (1.355 > 0.75 MELTED)
Slow-to-TCT Selectivity RatioRecloser_Slow_s / Fuse_Total_Clear_TCT_s2.30 SELECTIVE (3.08 selective)
Net 0.75·MMT Thermal Margin (ms)(0.75 * Fuse_MMT_s - Recloser_Fast_s) * 1000+16.50 ms SAFE (-18.75 ms NUISANCE BLOW)

IEEE C37.60 Fast/Slow Recloser-to-Expulsion-Fuse TCC Coordination Formula

Validate Fault_Current I_f in [50, 40,000] A, Recloser_Fast in [0.015, 2.0] s, Fuse_MMT >= 0.008 s, Fuse_TCT > Fuse_MMT, and Recloser_Slow > Recloser_Fast.

=LET(if_a, B2, tf_s, B3, tm_s, B4, tt_s, B5, ts_s, B6, IF(OR(if_a < 50, if_a > 40000, tf_s < 0.015, tf_s > 2, tm_s < 0.008, tt_s <= tm_s, ts_s <= tf_s), "Invalid Recloser Input", ROUND((0.75 * tm_s - tf_s) * 1000, 2)))

Close-In Substation Lateral (I_f = 4,600 A, MMT = 0.031 s vs Fast = 0.042 s) Coordination-Limit Check

Check a tap 400 m outside the substation fence (B2 = 4,600 A) where vacuum-interrupter mechanical floor clamps tfast at B3 = 0.042 s (2.5 cycles) while the inverse fuse MMT plunges to B4 = 0.031 s (B5 = 0.052 s, B6 = 0.160 s): Fast-to-MMT Ratio E3 crosses unity to 1.355 and Thermal Margin E5 flips negative to -18.75 ms—proving Fuse-Saving fails above the maximum coordination current unless utilities add a series current-limiting reactor or upsize to a 140T link.

=IF(ISTEXT(E5), E5, ROUND(B3 / B4, 3))