Arte SheetsLearn. Try. Understand.

Non-Newtonian Fluid Mechanics, API 13D Herschel-Bulkley & Bingham Plug Flow

Herschel-Bulkley Yield Stress & Pipe Plug-Flow Formula

Calculate Herschel-Bulkley Total Shear Stress tau (Pa), Apparent Viscosity (mPa·s / cP), Unsheared Central Plug Radius Ratio rp/R, and Sheared Flowing Area (%).

Why xanthan drilling muds and concrete slurries travel down pipe centers as a solid, un-sheared cylindrical plug

Drilling fluids, mine paste backfill, cement slurries, and ketchup combine a finite Yield Stress tau_y (Pa, needed to suspend barite weighting solids and rock cuttings the instant mud pumps shut off) with shear-thinning power-law flow (Flow Behavior Index n < 1, Consistency Index K Pa·s^n). W. H. Herschel & R. Bulkley (API RP 13D) unified Bingham plastics (n = 1) and Ostwald power-law fluids (tau_y = 0) into **tau = tau_y + K * gamma_dot^n (Pa), giving Apparent Viscosity muapp = (tau / gamma_dot) * 1,000** (mPa·s = cP). Inside cylindrical pipe flow of Wall Shear Stress tau_w = (R * Delta_P) / (2 * L) (Pa), radial shear stress drops linearly toward zero at the pipe axis (tau(r) = tau_w * (r / R)): wherever tau(r) <= tau_y, the fluid cannot shear at all—moving as a rigid Unsheared Central Plug of Radius Ratio r_p / R = MIN(1, tau_y / tau_w) surrounded by a **Sheared Annular Envelope (1 - (r_p / R)^2) * 100%**.

Verify on an API RP 13D Xanthan-Polymer Drilling Mud at Fann 300 RPM (511 s⁻¹)—Yield_Stress tau_y = 8.40 Pa (B2), Consistency K = 0.42 Pa·s^n (B3), Shear-Thinning_Index n = 0.68 (B4), Viscometer_Shear_Rate gamma_dot = 511 s⁻¹ (B5), and Pipe_Wall_Shear_Stress tau_w = 24.0 Pa (B6): Shear Stress equals 37.57 Pa (E2), Apparent Viscosity equals 73.53 cP (E3), Central Plug Radius Ratio r_p / R equals 0.350 (E4), leaving 87.75% of pipe cross-section actively sheared (E5).

API RP 13D Herschel-Bulkley KPI (K=0.42, n=0.68, gamma=511 s⁻¹, tau_w=24 Pa)FormulaVerified Output
Total Shear Stress tau (Pa)Yield_tau_y_Pa + K * (Shear_Rate ^ n)37.57 Pa (48.97 Pa @ gelled 19.8 Pa)
Apparent Viscosity (mPa·s / cP)(Shear_Stress_Pa / Shear_Rate_inv_s) * 100073.53 cP (95.84 cP @ gelled 19.8 Pa)
Central Plug Radius Ratio (rp / R)MIN(1, Yield_tau_y_Pa / Wall_tau_w_Pa)0.350 (0.825 massive core plug @ 19.8 Pa)
Sheared Annular Area (%)(1 - (Plug_Radius_Ratio ^ 2)) * 10087.75% (31.94% thin wall slip @ 19.8 Pa)

API RP 13D Herschel-Bulkley Constitutive Law & Cylindrical Plug-Core Formula

Validate Yield_Stress tau_y >= 0 Pa, Consistency K > 0.001 Pa·s^n, Behavior_Index n in (0.10, 2.00], Shear_Rate gamma_dot > 0.1 s⁻¹, and Wall_Shear tau_w > 0.1 Pa.

=LET(ty_p, B2, kc_p, B3, nb_i, B4, gd_s, B5, tw_p, B6, IF(OR(ty_p < 0, kc_p <= 0.001, nb_i <= 0.1, nb_i > 2, gd_s <= 0.1, tw_p <= 0.1), "Invalid Rheology Input", ROUND((1 - (MIN(1, ty_p / tw_p) ^ 2)) * 100, 2)))

Flocculated High-Yield Bentonite Gel (tau_y = 19.8 Pa) 82.5% Plug-Core Check (Set Yield Stress B2 = 19.8 Pa)

Contaminate bentonite mud with cement calcium so Yield Stress jumps to tau_y B2 = 19.8 Pa: Central Plug Radius Ratio E4 swells to 0.825 (82.5% of pipe diameter moves as an un-mixed solid piston) and Sheared Envelope Area E5 shrinks to 31.94%—promoting flat-profile cuttings transport at low velocity.

=IF(ISTEXT(E5), E5, ROUND(MIN(1, B2 / B6), 3))

Try the example

Use the original values or change them to test your understanding.

Further reading