Arte SheetsLearn. Try. Understand.

Marine Terminal & LNG Berth Engineering, OCIMF MEG4 Mooring Wind/Current & %MBL

OCIMF Vessel Mooring Wind, Current & Hawser %MBL Formula

Calculate Aerodynamic Wind Load (kN), Seawater Tidal Current Drag (kN), Combined Environmental Surge/Sway Force (kN), and Hawser Tension as % of Ship Design MBL.

A 1.6 m/s (~3.1 knot) tidal current pushes harder on a loaded tanker hull than a 22 m/s (43 knot) gale—because seawater is 837x denser than air

Port berth engineers and LNG marine terminals size quick-release mooring hooks and HMPE / wire-rope spring lines using OCIMF Mooring Equipment Guidelines (MEG4). Standard 30-second Wind Gust V_w (m/s, Air Density rho_a = 1.225 kg/m³) acting on Above-Water Projected Area A_w (m²) with Drag Coefficient C_w exerts **Wind Force F_w = (0.5 * 1.225 * C_w * A_w * V_w^2) / 1,000 (kN), whereas Seawater Current V_c (m/s, Seawater Density rho_s = 1,025 kg/m³) acting on Submerged Cross-Section/Wetted Area A_c (m², Coefficient C_c including shallow under-keel clearance amplification) exerts Current Drag F_c = (0.5 * 1,025 * C_c * A_c * V_c^2) / 1,000 (kN). Distributing Combined Load Ftot = F_w + F_c across Nlines active mooring lines (applying a 1.15 unequal pretension load-sharing factor) checks Line Stress %MBL = (((1.15 * Ftot) / Nlines) / MBL) * 100% against the OCIMF 55% Ship Design MBL Working Limit** (60% winch brake render setting).

Verify on an Aframax Tanker Berthed in a Tidal Estuary—Wind_Speed V_w = 22.0 m/s (B2), Wind_Area A_w = 1,450 m² (B3), Wind_Coeff C_w = 0.82 (B4 -> Wind Load F_w = 352.5 kN in E2), Ebb_Current V_c = 1.60 m/s (B5), Submerged_Drag_Area A_c = 520 m² (B6), Shallow-Water_Current_Coeff C_c = 0.65 (B7 -> Current Load F_c = 443.5 kN in E3), Active_Spring_Lines N = 4 (B8), and Line_Design MBL = 1,150 kN (B9): Total Surge Load hits 795.9 kN (E4), loading each spring line to a safe 19.90% of MBL (E5).

OCIMF MEG4 Berth Mooring KPI (MBL=1,150 kN: Normal 22 m/s, 1.6 m/s, 4 Lines vs Squall 32/2.2, 2 Lines)FormulaVerified Output
Aerodynamic Wind Load Fw (kN)(0.5 * 1.225 * Cw * Aw * Vw^2) / 1000352.5 kN (745.7 kN @ 32 m/s squall)
Tidal Current Drag Fc (kN)(0.5 * 1025 * Cc * Ac * Vc^2) / 1000443.5 kN (838.4 kN @ 2.2 m/s spring ebb)
Total Environmental Load (kN)Wind_Force_kN + Current_Force_kN795.9 kN (1,584.1 kN @ squall)
Peak Hawser Tension (% MBL)(((1.15 * F_tot) / N_lines) / MBL) * 10019.90% (79.21% > 60% BRAKE RENDER)

OCIMF MEG4 Wind + Shallow-Water Current Drag & Hawser %MBL Formula

Validate Wind_Speed V_w >= 0 m/s, Wind_Area A_w > 10 m², C_w in [0.2, 2.0], Current_Speed V_c >= 0 m/s, Submerged_Area A_c > 10 m², C_c in [0.1, 3.0], integer Lines N >= 1, and MBL > 50 kN.

=LET(vw_m, B2, aw_m, B3, cw_d, B4, vc_m, B5, ac_m, B6, cc_d, B7, nl_c, B8, mb_k, B9, fw_k, (0.5 * 1.225 * cw_d * aw_m * (vw_m ^ 2)) / 1000, fc_k, (0.5 * 1025 * cc_d * ac_m * (vc_m ^ 2)) / 1000, IF(OR(vw_m < 0, aw_m <= 10, cw_d < 0.2, cw_d > 2, vc_m < 0, ac_m <= 10, cc_d < 0.1, cc_d > 3, nl_c < 1, mb_k <= 50), "Invalid Mooring Input", ROUND((((1.15 * (fw_k + fc_k)) / nl_c) / mb_k) * 100, 2)))

32 m/s Squall + 2.2 m/s Spring Tide on 2 Slack-Mismanaged Lines Brake-Render Check

Hit a 32 m/s thunderstorm gust with 2.2 m/s spring tide while 2 slack lines leave only N = 2 taut springs carrying surge (B2 = 32, B5 = 2.2, B8 = 2): Total Force E4 doubles to 1,584.1 kN and Line Stress E5 spikes to 79.21% of MBL—exceeding both the 55% SWL ceiling and 60% winch brake render point, causing vessel drift that triggers emergency loading-arm ERS disconnect.

=IF(ISTEXT(E5), E5, LET(fw_k, (0.5 * 1.225 * B4 * B3 * (B2 ^ 2)) / 1000, fc_k, (0.5 * 1025 * B7 * B6 * (B5 ^ 2)) / 1000, ROUND(fw_k + fc_k, 1)))