Wellbore Zonal Isolation & Primary Cementing, API Spec 10A Absolute-Volume Slurry Design
Oilwell Primary Cementing Slurry Yield & Sack Count Formula
Calculate API Absolute-Volume Slurry Yield (ft³/sack), Mixed Slurry Density (ppg), Required Bulk Cement Sacks Including Open-Hole Washout Excess, and Total Mix Water (bbl).
Confusing a 94-lb bulk cement sack’s 1.00 ft³ aerated silo volume with its 0.480 ft³ absolute grain volume leaves primary cement tops 600 feet below the freshwater shoe
A standard API bulk sack of Class G / Class H Oilwell Portland Cement weighs Wsk = 94 lb and occupies 1.00 ft³ (7.48 gal) *dry with 52% trapped air in the bulk p-tank*—yet once sheared in a jet/recirculating mixer with Mix Water V_w (gal/sk at 8.33 lb/gal), every air pocket vanishes leaving only **Absolute Mineral Grain Volume Vabs = Wsk / (SGcem * 8.33) (3.594 gal/sk = 0.480 ft³/sk at SGcem = 3.14). By API 10A / 10B Absolute-Volume Additive Accounting, Slurry Yield Y = (Vabs + V_w) / 7.48052 (ft³/sack), Slurry Density rho_s = (Wsk + V_w * 8.33) / (Vabs + V_w) (ppg), Required Cement Sacks Nsk = ROUNDUP((Vgauge * (1 + Ewash / 100)) / Y, 0) across Gauge Annular Volume Vgauge (ft³) plus Caliper/Washout Excess Ewash (%), and Mix-Tank Water Vtot,bbl = (Nsk * V_w) / 42** (oilfield barrels at 42 gal/bbl).
Verify on a 15.8 ppg Neat Class G Tail Cement Job—Sack_Weight Wsk = 94.0 lb (B2), Cement_Specific_Gravity SGcem = 3.14 (B3), Mix_Water_Requirement V_w = 5.00 gal/sk (B4), Gauge_Annular_Volume Vgauge = 680 ft³ (B5), and Open-Hole_Washout_Excess Ewash = 25.0% (B6): Slurry Yield equals 1.149 ft³/sk (E2), Slurry Density equals 15.78 ppg (E3), Required Bulk Cement equals 740 sacks (E4), requiring 88.10 bbl of fresh mix water on location (E5).
| API 10A Primary Cementing KPI (94 lb Sack, SG=3.14, Gauge=680 ft³) | Formula | Verified Output |
|---|---|---|
| Absolute Slurry Yield (ft³/sk) | ((Sack_lb / (SG * 8.33)) + Water_gal) / 7.48052 | 1.149 ft³/sk tail (1.577 ft³/sk extended lead) |
| Mixed Slurry Density (ppg) | (Sack_lb + Water_gal * 8.33) / (Abs_gal + Water_gal) | 15.78 ppg tail (13.76 ppg bentonite lead) |
| Bulk Cement Sacks Required (sk) | ROUNDUP((Gauge_ft3 * (1 + Excess_Pct/100)) / Yield, 0) | 740 sk @ 25% excess (626 sk @ 45% lead) |
| Total Mix Water Required (bbl) | (Required_Sacks * Mix_Water_gal_sk) / 42 | 88.10 bbl (122.22 bbl mix tank volume) |
API Spec 10A Absolute-Volume Slurry Yield, Density & Barrel Water Formula
Validate Sack_Weight in [50, 120] lb, Cement_SG in [2.60, 3.30], Mix_Water in [3.0, 18.0] gal/sk, Gauge_Volume in [20, 25,000] ft³, and Open-Hole_Excess in [0, 150]%.
=LET(ws_l, B2, sg_c, B3, mw_g, B4, av_f, B5, ex_p, B6, yl_f, ((ws_l / (sg_c * 8.33)) + mw_g) / 7.48052, IF(OR(ws_l < 50, ws_l > 120, sg_c < 2.6, sg_c > 3.3, mw_g < 3, mw_g > 18, av_f < 20, av_f > 25000, ex_p < 0, ex_p > 150), "Invalid Cement Input", ROUND((ROUNDUP((av_f * (1 + ex_p / 100)) / yl_f, 0) * mw_g) / 42, 2)))Bentonite-Extended Light Lead Slurry (8.2 gal/sk Water, 45% Washout Excess) Fracture-Gradient Check
Switch to a pre-hydrated gel-extended lead slurry (B4 = 8.20 gal/sk water) across unconsolidated washed-out sands (B6 = 45% excess) to stay below formation fracture gradient: Slurry Density E3 drops safely to 13.76 ppg while Yield E2 expands to 1.577 ft³/sk, trimming cement tonnage to 626 sacks (E4) while increasing rig-tank mix water E5 to 122.22 bbl.
=IF(ISTEXT(E5), E5, LET(yl_f, ((B2 / (B3 * 8.33)) + B4) / 7.48052, ROUNDUP((B5 * (1 + B6 / 100)) / yl_f, 0)))Try the example
Use the original values or change them to test your understanding.