Arte SheetsLearn. Try. Understand.

Warehouse Structural Racking, ANSI/RMI MH16.1 Beam Deflection & Material Storage

Selective Pallet-Rack Beam Deflection (L/180) Formula

Calculate Uniform Load Per Front/Rear Step Beam (kN), Midspan Elastic Beam Deflection delta (mm), ANSI/RMI MH16.1 L/180 Serviceability Limit (mm), and Deflection Utilization (%).

Pallet-rack step beams are often governed by RMI L/180 midspan bow—before steel yield stress is ever reached

Under ANSI/MH16.1 (Rack Manufacturers Institute, RMI) and EN 15512, two parallel roll-formed box/step beams spanning clear bay width L (mm, e.g. 2,700 mm for two Euro/GMA pallets) share total level payload equally (W_beam = (N_pallets * m_pallet * g) / 2 N per beam, assuming symmetric front-to-back pallet overhang). Treating end-connector clip stiffness conservatively as a simply supported uniform load gives Midspan Vertical Deflection delta = (5 * W_beam * L^3) / (384 * E * I_y) mm, which RMI caps strictly at delta_max = L / 180 (15.00 mm on a 2,700 mm span; L / 200 in automated AS/RS racks) so pallets never tilt dangerously toward the aisle or snag reach-truck fork tips.

Verify on a 2,700 mm Clear-Span Selective Rack Level Supporting Two 1,100 kg Pallets—Clear_Beam_Span L = 2,700.0 mm (B2 -> RMI L/180 Limit = 15.00 mm in E4), Unit_Pallet_Mass = 1,100.0 kg (B3), Pallets_Per_Pair_Level = 2 (B4 -> Load Per Single Beam = 10.79 kN in E2), Single_Box_Beam_Moment_of_Inertia I_y = 215.0 cm⁴ (2,150,000 mm⁴, B5), and Cold-Formed_Steel_Modulus E = 200.0 GPa (200,000 MPa, B6): Midspan Deflection equals 6.43 mm (E3), utilizing 42.86% of the RMI L/180 ceiling (E5).

ANSI/RMI MH16.1 Rack Beam KPI (L=2,700 mm, 2x 1,100 kg Pallets, Iy=215 cm⁴)FormulaVerified Output
Load Per Single Beam W_beam (kN)(Pallet_kg * Pallets * 9.80665 / 2) / 100010.79 kN
Midspan Elastic Deflection (mm)(5 * W_N * (L^3)) / (384 * E_MPa * Iy_mm4)6.43 mm (12.57 mm @ light 110 cm⁴ beam)
RMI MH16.1 L/180 Ceiling (mm)Beam_Clear_Span_L_mm / 18015.00 mm
Serviceability Deflection Used (%)(Deflection_mm / RMI_Limit_mm) * 10042.86% (83.78% @ light 110 cm⁴ beam)

RMI MH16.1 Simply-Supported Pair-Beam Elastic Deflection Formula

Validate Beam_Span L >= 900 mm, Pallet_Mass > 0 kg, Pallets_Per_Level >= 1, Single_Beam_Iy > 10 cm⁴ (convert 1 cm⁴ = 10,000 mm⁴), and Steel_Modulus E in [180, 220] GPa (1 GPa = 1,000 MPa).

=LET(ln_m, B2, mp_k, B3, np_l, B4, iy_c, B5, em_g, B6, IF(OR(ln_m < 900, mp_k <= 0, np_l < 1, iy_c <= 10, em_g < 180, em_g > 220), "Invalid Rack Input", LET(wb_n, (mp_k * np_l * 9.80665) / 2, df_m, (5 * wb_n * (ln_m ^ 3)) / (384 * (em_g * 1000) * (iy_c * 10000)), lm_r, ln_m / 180, ROUND((df_m / lm_r) * 100, 2))))

Light-Gauge 110 cm⁴ Step-Beam Substitution Check (Set Single-Beam Iy B5 = 110.0 cm⁴)

Downsize to a shallow light-gauge step beam with I_y B5 = 110.0 cm⁴: Midspan Bow E3 nearly doubles from 6.43 mm to 12.57 mm, pushing RMI Serviceability Utilization E5 to 83.78% (and exceeding stricter L/250 = 10.8 mm AS/RS crane-fork tolerances).

=IF(ISTEXT(E5), E5, LET(wb_n, (B3 * B4 * 9.80665) / 2, ROUND((5 * wb_n * (B2 ^ 3)) / (384 * (B6 * 1000) * (B5 * 10000)), 2)))

Try the example

Use the original values or change them to test your understanding.

Further reading