Wire-EDM Spark Pulse Energy, Overcut & Kerf Offset Formula

Calculate Single-Spark Discharge Energy (mJ), Pulse Duty Factor (%), Empirical Radial Spark Overcut Gap (um), and Total Wire-EDM Kerf Slot Width (mm).

Programming CNC wire-EDM path offsets by half the 0.250 mm brass wire radius (0.125 mm) forgets the +41.9 um radial plasma spark gap—cutting punch dies 83.8 um undersize

Traveling-Wire Electrical Discharge Machining (Wire-EDM) vaporizes 62 HRC hardened D2 / tungsten-carbide stamping dies inside deionized water (< 10 uS/cm) without mechanical cutting force—using 10,000 K plasma micro-craters of **Single-Pulse Discharge Energy E_p = (V_d * I_p * ton) / 1,000 (mJ at Gap Discharge Voltage V_d V, Peak Spark Current I_p A, and Pulse-On Duration ton us) cycled at Pulse Duty Factor DF = (ton / (ton + toff)) * 100% (kept <= 35%–40% so toff flushes debris before stationary DC arcs snap the brass wire). Because crater depth and plasma channel expansion scale as g_r ~= 4.2 * (I_p^0.4) * (ton^0.3) (um radial overcut per side on tool steel), Total Wire Kerf Width equals Wkerf = dwire + (2 * g_r) / 1,000** (mm -> CNC Cutter-Radius Offset H = Wkerf / 2 plus skim stock).

Verify on a Roughing Main-Cut Pass in 50 mm D2 Tool Steel—Gap_Discharge_Voltage V_d = 28.0 V (B2), Peak_Pulse_Current I_p = 36.0 A (B3), Pulse-On_Time ton = 18.0 us (B4), Pulse-Off_Flush_Time toff = 42.0 us (B5), and Brass_Wire_Diameter dwire = 0.250 mm (B6): Single-Spark Energy equals 18.14 mJ (E2), Pulse Duty Factor equals 30.0% (E3), Radial Spark Gap g_r equals 41.9 um per side (E4), and Total EDM Kerf Width equals 0.3338 mm (0.1669 mm centerline offset + finish allowance. E5).

Wire-EDM Pulse & Kerf KPI (Vd=28 V, 0.250 mm Brass Wire)FormulaVerified Output
Single-Spark Energy Ep (mJ)(Discharge_V * Peak_I_A * Pulse_ton_us) / 100018.14 mJ rough (0.17 mJ finish skim)
Pulse Duty Factor (%)(Pulse_ton_us / (ton_us + toff_us)) * 10030.0% rough (11.1% anti-recast skim)
Radial Spark Overcut gr (um)4.2 * (Peak_I_A ^ 0.4) * (Pulse_ton_us ^ 0.3)41.9 um/side (8.3 um/side skim)
Total Wire Kerf Width (mm)Wire_Diam_mm + (2 * Radial_Overcut_um) / 10000.3338 mm rough (0.2665 mm skim)

Wire-EDM Spark Crater Energy, Duty Flushing & Kerf Compensation Formula

Validate Discharge_Voltage V_d in [15, 60] V, Peak_Current I_p in [0.5, 500] A, Pulse_On ton in [0.1, 200] us, Pulse_Off toff in [1.0, 1,000] us, and Wire_Diameter in [0.02, 0.36] mm.

=LET(vd_v, B2, ip_a, B3, tn_u, B4, tf_u, B5, wd_m, B6, sg_u, 4.2 * (ip_a ^ 0.4) * (tn_u ^ 0.3), IF(OR(vd_v < 15, vd_v > 60, ip_a < 0.5, ip_a > 500, tn_u < 0.1, tn_u > 200, tf_u < 1, tf_u > 1000, wd_m < 0.02, wd_m > 0.36), "Invalid EDM Input", ROUND(wd_m + (2 * sg_u) / 1000, 4)))

Third-Skim Mirror Finish Pass (I_p = 4 A, t_on = 1.5 us, t_off = 12 us) Recast Removal Check

Switch the generator to a low-capacitance finish trim (B3 = 4.0 A, B4 = 1.5 us, B5 = 12.0 us): Spark Energy E2 drops 108x to 0.17 mJ (11.1% duty in E3), shrinking Radial Spark Gap E4 from 41.9 down to 8.3 um (0.2665 mm kerf in E5) so the wire shaves off the brittle white thermal recast layer to Ra < 0.25 um.

=IF(ISTEXT(E5), E5, ROUND(4.2 * (B3 ^ 0.4) * (B4 ^ 0.3), 1))